In order to reduce the emission of exhaust fumes to the air DCT Gdańsk purchased 15 electrical RTG cranes, to be used at the newly-constructed berth and stacking yards of T2 (the investment was completed at the end of 2016). Additionally, in 2016 there were electrified 2 cranes with combustion engines, which had already been operated at the existing T1 terminal.