The first aRTG cranes at Baltic Hub were assembled in March, and the last ones will be assembled in the summer.
In the next stage, the cranes will be commissioned, tested and integrated into our systems.
The introduction of automated cranes to the terminal is another step towards reducing CO2 emissions at Baltic Hub.